Stage 1 Chiller Installation - DC Two Data Centre Construction

201 Просмотры
Издатель
An enterprise datacentre uses a lot of power, and generates a lot of heat in the process. Our data centre uses hot and cold isles, with circulated chilled water to exchange heat and to keep the equipment running at optimal operating temperatures.

The stage 1 chiller installation is just the first stage of this cooling system, with larger chillers being installed when the data centre advances through further stages of the construction.

Follow us to watch the evolution of our state-of-the-art facility, as we work towards Tier III certification in the coming months.