HVAC: Cooling Tower Float Valve Installation/Replacement ( Cooling Tower Make Up Water Float valve)

141 Просмотры
Издатель
Veto Pro Pac Tech XL Tool Bag
https://amzn.to/36HJTAS

Milwaukee Cut 1 Dipped Gloves L
https://amzn.to/3gbmtHc

Milwaukee Fastback Hawk Bill Folding Knife
https://amzn.to/3mV86ct

Klein Tools 7-in-1 Nut Driver, Magnetic Driver
https://amzn.to/2JIZWWj

14" Rigid Aluminum Pipe Wrench
https://amzn.to/3lM2y2L

18" Rigid Aluminum Pipe Wrench
https://amzn.to/3lGOhV3

Bernzomatic TS8000 High Intensity Trigger Start Torch
https://amzn.to/2JOtDVM

Bernzomatic MAP-Pro Gas Torch Style Cylinder (2 Pack)
https://amzn.to/3mWxcrt

Blue Monster 1/2 Inch Teflon Tape (3 Pack)
https://amzn.to/3mUq5Qe

Blue Monster 3/4 Inch Teflon Tape (3 Pack)
https://amzn.to/39XavQ6

Loctite Thread Sealant, 1 pt, Brush Can, White, 16 oz.
https://amzn.to/2JWe3r2

Float Valve Setup Instructions
After float valve installation, there will be some experimenting and analysis of the valve that may be required to balance the tower operation with makeup water. Normally, the setting of the float valve will be set so that zero water is wasted during pump shutdown through the overflow. However, the water level depth during the start up of your pump must be deep enough to ensure maximum pump suction.

To set the basin water level, adjust the wing nuts so that the make-up valve is completely shut when the water level gets to 1/2″ below the overflow connection. These settings will produce operating levels shown in your Maintenance and Operating Manual. To adjust make-up assembly see that manual for the manufacturers’ suggested operating levels. Set the bleed rate and desired cycles of concentration and then you can begin operation. It’s always safe to let it run for 24 hours before you check and readjust.