The walls of the casting section are finally getting closed (7:40) and the construction of the lobby started (2:22, 4:44) at Tesla's Gigafactory Berlin-Brandenburg.
The area for the new parking lot is getting covered with gravel (0:25) and the western road has been paved with asphalt (2:50). More footings have been poured for the waste water treatment building (7:03, 13:20) and the first pipe rack has been installed in the future central utility building (12:50).
The second part of the foundation of the sprinkler center is ready for concrete (12:03) as well as the area for refrigerators (process cooling chillers) (12:28). A lot more beams have been installed at the cell production building (16:10), and construction of the storm water retention basin and pumping station started (22:00).
If you want to support me:
https://www.paypal.me/tobiaslindh
https://www.patreon.com/tobiaslindh
Bitcoin: bc1qdl63dswrepe25hdh86wlktmrhcm29t3zyqa8k2
Follow me on Twitter for the latest updates:
https://twitter.com/tobilindh
See all my photos from Giga Berlin:
http://photos.app.goo.gl/YyEoF8GKiQ9FqAw16
For videos from Giga Shanghai I recommend the channel of Wuwa (乌瓦):
https://www.youtube.com/channel/UCxAmZPvFRAc7Bvqhig57mNQ
Music in this Video:
1. Jeremy Blake - The Emperor's Army
2. Jeremy Blake - Heaven and Hell (Part 2)
3. Jeremy Blake - Let's Go Home
4. Jeremy Blake - Sunspots
I have the permission to fly over the factory site as well as the industrial rail.
#tesla #gigafactory #gigaberlin
The area for the new parking lot is getting covered with gravel (0:25) and the western road has been paved with asphalt (2:50). More footings have been poured for the waste water treatment building (7:03, 13:20) and the first pipe rack has been installed in the future central utility building (12:50).
The second part of the foundation of the sprinkler center is ready for concrete (12:03) as well as the area for refrigerators (process cooling chillers) (12:28). A lot more beams have been installed at the cell production building (16:10), and construction of the storm water retention basin and pumping station started (22:00).
If you want to support me:
https://www.paypal.me/tobiaslindh
https://www.patreon.com/tobiaslindh
Bitcoin: bc1qdl63dswrepe25hdh86wlktmrhcm29t3zyqa8k2
Follow me on Twitter for the latest updates:
https://twitter.com/tobilindh
See all my photos from Giga Berlin:
http://photos.app.goo.gl/YyEoF8GKiQ9FqAw16
For videos from Giga Shanghai I recommend the channel of Wuwa (乌瓦):
https://www.youtube.com/channel/UCxAmZPvFRAc7Bvqhig57mNQ
Music in this Video:
1. Jeremy Blake - The Emperor's Army
2. Jeremy Blake - Heaven and Hell (Part 2)
3. Jeremy Blake - Let's Go Home
4. Jeremy Blake - Sunspots
I have the permission to fly over the factory site as well as the industrial rail.
#tesla #gigafactory #gigaberlin